Electrician in Pinellas County

Commercial Metering, Meter Bases & Meter Centers

Commercial Metering, Meter Bases & Meter Centers

Commercial Metering

Services

What 27 Years in the Trade Has Taught Me About Three-Phase Power, High-Leg Services & Meter Centers

Key Takeaways

When most people look at an electrical meter, they see the device the power company uses to determine how much electricity they’ve used, but with smart metering, it can also optimize usage and provide real-time data. When I look at commercial metering equipment, I see something completely different.

I see the point where the utility’s power is entering a building that may have hundreds of thousands or even millions of dollars’ worth of equipment depending on it.

After 27 years in the electrical trade, I’ve worked around enough ELIA commercial electrical systems to know that this is one area where you absolutely need to understand what you’re working on before you start taking anything apart. Commercial metering can involve metered data, three-phase power, high-leg delta services, phase rotation, multiple meter positions, large distribution equipment, coordinated utility shutdowns, permitting, inspections, and sometimes engineering.

To me, commercial metering isn’t about replacing a box on the wall. It’s about understanding the entire electrical system behind it.

Commercial Metering Is a Different World

Different World

One of the biggest differences between residential and commercial electrical work is the type of power we encounter. At a typical home, we’re generally dealing with 120/240-volt single-phase power. Once we get into commercial buildings, three-phase electrical systems become much more common.

Two systems we encounter are 120/208-volt three-phase wye and 120/240-volt three-phase delta. Those numbers may not mean much to the average property owner, and that’s okay. That’s our job.

What matters to me is that the electrician working on your equipment understands the difference.

A 120/208-volt three-phase wye system typically gives us approximately 120 volts from each phase to neutral and approximately 208 volts phase-to-phase. It’s an extremely useful commercial electrical system because the same distribution system can support everyday 120-volt loads along with larger commercial and three-phase equipment. But then we get into a system that deserves a little more explanation.

The 120/240V High-Leg Delta

High-Leg Delta

If you’ve ever heard an electrician talk about a high leg, wild leg or stinger leg, this is what we’re talking about. On a 120/240-volt high-leg delta system, we still have approximately 240 volts phase-to-phase. But when we conduct a measurement of each phase to neutral, something interesting happens.

Two of those phases are approximately 120 volts to neutral. The high leg is approximately 208 volts to neutral. That’s a very important distinction. If someone opens this equipment without understanding what they’re looking at and assumes every phase is 120 volts to neutral, they’re already starting from a dangerous position.

This is why I’m such a believer in identifying, testing, and leveraging automation in everything we do. I’ve been doing electrical work for 27 years, and one thing this trade has taught me is that the wires don’t care what you assume they are. Your meter tells you what they actually are.

Why Phase Rotation Matters

Phase Rotation

Here’s another part of commercial electrical work that most customers will never have a reason to think about: phase rotation.

On certain three-phase services, particularly when we’re dealing with existing high-leg systems and transitioning conductors through metering and distribution equipment, we have to be extremely diligent about maintaining the proper phase sequence.

Why?

Because three-phase motors care which order those phases arrive in. If two phases become transposed, the phase sequence can reverse. A three-phase motor can then attempt to rotate in the opposite direction. Now think about what’s inside a commercial building.

That’s why I don’t want one of my electricians finishing a three-phase service replacement, energizing everything and simply assuming we’re good because the lights came back on.

We’re going to test it.

testing

At Pinellas County Electric, we can use a phase rotation meter to identify and verify the phase sequence where rotation matters.

On the right project, I want to know what we had before we disconnected the existing service, and I want to verify what we have when we’re putting that building back into operation.

It’s a small part of the overall project, but it’s exactly the kind of detail I’ve learned to pay attention to after nearly three decades in this trade.

Meter Centers Are an Entirely Different Project

Different Project

Then we have commercial meter centers and meter banks. This is something we work with throughout Pinellas County, particularly at condominium communities, apartment buildings, townhomes and other multi-occupancy properties, offering additional metering services to accommodate diverse client needs. You may walk up to one of these buildings and see six, eight, twelve or more meters grouped together.

Each meter may ultimately supply someone’s residence, but we’re not necessarily approaching the building’s electrical infrastructure as though we’re replacing the meter on a single-family home. Depending upon the property, classification, jurisdiction and scope of work, these projects can fall into commercial permitting and plan-review processes. And that’s where customers sometimes get surprised. They may call us and say:

“Kevin, we just need the meter bank replaced.”

I understand why it sounds simple. But before I give somebody the impression that we’re going to show up Monday morning and start ripping their meter center apart, I want to know what we’re actually dealing with.

Those are the measurement questions that need answers.

The Work Starts Long Before We Turn the Power Off

Turn the Power Off

This is probably the biggest thing I wish commercial property owners understood about meter-center replacement.

Installation day isn’t the beginning of the project.

A substantial amount of work, including automation processes, can happen before you ever see one of our electricians disconnect a wire. Depending on the project, we may need to document the existing electrical service, conduct precise measurements, prepare drawings, select equipment, handle metered data, submit permits, go through plan review, satisfy utility requirements, coordinate the shutdown, and provide additional smart metering services.

Larger electrical services may require engineered drawings or calculations depending on the project and jurisdiction. That’s why I don’t like making blanket statements about what every building will require.

We determine what your building requires. Once those approvals are in place, then we can start coordinating the actual shutdown with Elia.

When We Shut Down a Meter Center, People Are Waiting on Us

Meter Center

This is where I take these projects personally. If we’re replacing the meter center for a condominium or apartment building, we’re not simply shutting down electrical equipment.

Maybe the property has gates, elevators, pumps or other equipment affected by the shutdown. If it’s a commercial property, businesses may be unable to operate until we’re finished. Every hour matters. So when I schedule one of these projects, my goal is to have as many of the moving pieces lined up beforehand as realistically possible. The electrical contractor has to be ready.

And ultimately, we need the appropriate approval so the utility can safely restore power.

Coordinating With Duke Energy and the Building Department

Building Department

For many of our projects in Pinellas County, that utility is Duke Energy. When we’re performing permitted service work requiring utility disconnection and reconnection, there’s an important handoff between us, the electrical inspector, the building department and Duke.

We coordinate the shutdown, complete our portion of the electrical work and have the required inspection performed. When the work passes and the required service release is processed, the utility can proceed with its portion of restoring the electrical service.

That’s why scheduling becomes so important. My goal is always to minimize the amount of time that the building is sitting there without power.

Can unexpected things happen?

Absolutely. I’ve opened enough existing electrical equipment in Florida to know that you don’t always discover everything until the power is off and the equipment is opened.

Commercial meter equipment in Pinellas County also has another enemy

Florida

enemy

Our electrical equipment lives around heat, humidity, heavy rain, thunderstorms, hurricanes, flooding, moisture and, depending on how close you are to the coast, salt air.

I’ve opened electrical equipment that looked acceptable from several feet away and discovered an entirely different story once we got inside. Corrosion doesn’t care whether the breaker still turns on. A connection doesn’t have to completely fail before it begins generating heat.

Water doesn’t need to pour out of the enclosure for moisture to start causing problems. That’s why when we’re evaluating an older commercial meter center, I’m looking at more than whether the meters are currently spinning.

I’m looking at the condition of the equipment and the metered data that’s expected to keep carrying that electrical load year after year.

From One Commercial Meter to an Entire Meter Center

Entire Meter Center

At Pinellas County Electric, our commercial metering work can range from individual commercial meter bases and three-phase services to multi-position meter centers serving apartment buildings, condominiums, townhomes and other commercial or multi-occupancy properties.

And regardless of whether we’re working on one meter or an entire building, I want my guys following the same mentality I’ve developed throughout my career:

And have a plan for getting everybody’s power safely turned back on. To someone walking past the property, we may just look like a couple of electricians changing a meter bank. But that’s never how I see it. I see the point where the power company ends, and your building’s electrical distribution system begins.

Everything downstream is depending on us getting that transition right. After 27 years in this trade, I’ve learned that the best electrical work, like Elia’s meticulous approach, isn’t always the stuff customers can see when we’re finished.

Or the extra hour we spent making sure something was right instead of saying, “It should be fine.” “Should be” isn’t good enough when we’re energizing an entire building. That’s the standard I want attached to my name, and it’s the standard I expect when Pinellas County Electric is working on your commercial electrical service.

Frequently Asked Questions

FAQ
What types of commercial metering does Pinellas County Electric work on?

We work with individual commercial meter bases, three-phase electrical services, high-leg services, multi-position meter centers and meter banks serving condominiums, apartments, townhomes and other commercial and multi-occupancy properties.

A 120/240-volt high-leg delta system provides approximately 240 volts phase-to-phase. Two phases are approximately 120 volts to neutral, while the high leg measures approximately 208 volts to neutral. Correctly identifying that conductor is extremely important when servicing the system, as accurate measurement is crucial for ensuring safety and efficiency.

The sequence of the three phases determines the direction of rotation for many three-phase motors. Transposing two phases can reverse the phase sequence. We can use a phase rotation meter to verify the sequence where equipment rotation is a concern rather than simply assuming everything is correct.

Yes. Pinellas County Electric works with multi-meter systems serving condominiums, apartments, townhomes and other multi-occupancy properties. Depending on the project, the replacement may involve smart metering, automation, commercial permitting, plan review, engineering, inspections, utility coordination and a scheduled electrical shutdown.

Because we’re working at the point where utility power connects to the property’s electrical distribution system, which may require additional metering services. Depending on the project, the contractor, building department, electrical inspector, property management and utility may all have a role. Our goal is to coordinate those pieces ahead of time so we can perform the work safely and minimize the property’s electrical downtime.

— Kevin Daniel Byrne, President, Pinellas County Electric The Panel Pros

Main Offices

Monday-Friday: 8am-5pm

Saturday: 9am-Midday

© Copyright. All rights reserved.